After having just past the 9th Ave. depot on the Neenah Sub. train 2 heads for the 18th Ave. depot (seen in the center background).
Train 2 heads east on the Neenah Sub. past the 9th Ave. depot.
Eastbound ore loads head for Point Yard.
Train 2 pulls out of the Oshkosh siding after meeting #19.
Train 19 heads up the main at Oshkosh East while #2 waits in the hole.
After coming off Byron Hill train 43's crew yards their train at Shops Yard.
Train 43 rolls down Byron Hill and on to Shops Yard.
Train 43 rolls down Byron Hill and on to Shops Yard.
After meeting #40 train 43 pulls out of the siding and heads down Byron Hill and on to Shops Yard.
After meeting #40 train 43 pulls out of the siding and heads down Byron Hill and on to Shops Yard.
TraWn 2 blasts out of town.
WC #7 (on the right) heads west as the PRANA (on the left) tries to keep up.
Train #2 rolls through Neeqah.
An eastbound rolls past the 'new' SOO depot at 19th Ave.