(Date approximate)
Unknown date, location, and photographer.
BM 1724 pushes a plow across the bridge in Gorham, NH.
1724-452-5019-7315-200-2924
1724-452-5019-7315-200-2924
1724-452-5019-7315-200-2924
GP-9s
1724-1732
1724-4268B-4227B-1727; Engr. Weldon MacDonald waving at me
1724-4268B-4227B-1727
1724-1748-1754
1743-1724
1724
1724(GP-9) crossing Portland-Boston main line
1724
-1724-2920-369
1724-452-5019-7315-200-2924
(1724-452-5019 helpers)-7315-200-2924
A Westbound work train leaves the yard.
BOED's power ambles past the derailment.
GP9 1724 is getting ready to depart with a work train.
The 1724 leaving with a work train.
B&M GP-9 #1724 sits at the Mechanicville e/f.
CPED passing the site of the former B&M station at Greenfield, which stood in the vacant ground at right. The "Fitchburg main" curves away westward to the right.
SPCP's power heads out to his train in Greenfield, while MELA's power waits to get in.