Phase 1 Amtrak 161 sits behind 181 Charlottesville station
Headed north, Amtrak 161 crosses the Winter Park Maitland Avenue bridge with the Silver Meteor.
Four lines of parked Amtrak power at Chicagos Union Station.
Three lines of parked Amtrak power at Chicagos Union Station.
p090-12
AMTK 161 The 50th Anniversary Phase 1 Heritage Unit leads the Evenings SW Chief into Fullerton headed for Chicago
50th Anniversary unit leads train #6 on the Ottumwa sub.
50th Anniversary unit leads train #6 on the Ottumwa sub.
Behind Phase I
1.14.2024 Charlottesville, VA. AMTK 161, the 50th Anniversary engine, departing Ch'ville on the NE Regional #156 with my son aboard heading back to school.
10.14.2020 Ivy, VA. AMTK 161 on the point of the westbound Cardinal. The now long-gone C&O Ivy Depot would be to the immediate right of the locomotive.
EB BNSF Mendota Sub
EB BNSF Mendota Sub
EB BNSF Mendota Sub
EB BNSF Mendota Sub
Amtrak Dash 8 and 50th Anniversary engine lead Amtrak 22 through downtown Saint Louis
Amtrak's Phase 1 heritage unit leads A5 west through the Route 59 station.