CN 2895 and CN 3841  Contributor's Pick!       
A CN through freight passes the former Byrd Ave. grade crossing and parallels Harrison St. as it transitions from the former SOO rails to the former C&NW rails at Neenah, WI, on 9 Aug. '20. Train had three locomotives, CN 2895 and CN 3841 pulling, as well as CN 8101 mid-train. Neenah Foundry Plant 2 & Plant 3 loom in the background at right. Plant 2 opened in 1960 and Plant 3 was built in 1967. Plant 1 opened in 1918 and stood about a mile to the north, until it was closed in 1994 and eventually demolished.
Date: 8/9/2020 Location: Neenah, WI   Map Show Neenah on a rail map Views: 66 Collection Of:   T. P. Bruss
Locomotives: CN 2895(ES44AC) CN 3841(ES44AC)    Author:  T. P. Bruss
CN 2895 and CN 3841
Picture Categories: This picture is part of album:  Northeast WI, Summer 2020
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=5536623