Working the Black River & Western, east of Main Street
EB mixed freight with NS 9253 "operation lifesaver" and SW-1001 #2104 (ex CR #9414) tucked in there, Main Street, 1107 hours
WB autorack, Main Street, 1818 hours
Just sitting on the BR&W interchange, was this along with two other units and a short train on an overcast day.
Another shot with the authentic Railroad Crossing sign in front as a prop.
WB 11J autorack on NS Lehigh Line, Main Street, 1756 hours
Crossing over River Rd on a lazy sunday afternoon.
Train 20W EC TOFC through Three Bridges, Main Street, 1215 hours
Working the Black River & Western transfer with the NS, west of Main Street
WB TOFC, Main Street, 0906 hours
EB NS 18G mixed freight, Main Street, 1028 hours
WB autorack train 11J stops short of new siding construction in Flemington Junction on the NS Lehigh Line, Main Street, Three Bridges
BRW 1853 works preparing cars for handoff to the NS at the BRW/NS interchange, Main Street, Three Bridges.
NS Hi-Hood SD40-2 #3291 pushes the BRW push-pull transfer at the BRW/NS interchange, Three Bridges.
NS Hi-Hood SD40-2 #3291 pushes the BRW push-pull transfer at the BRW/NS interchange on the NS Lehigh Line, Three Bridges.
EB mixed freight, Main Street, 1152 hours
BDRV 1853 is seen switching freight at Three Bridges after a recent snowfall. Exact Date Unknown.
BDRV 1853 switches at BR&W/NS interchange after recent snowfall.
Switching on former CNJ trackage after a recent snowfall.
EB doublestack/intermodal (Train 20G) past signal 48 on the NS Lehigh Line, Main Street, 0918 hours.
NS 8401 heading east on Lehigh Line. Three deer ran across the trestle just prior to the trains arrival.
Crossing 2 trestles that span the South branch of the Raritan River near milepost 57 on the LV.
Heading for the River Rd. crossing near milepost 57.
WB TOFC, Main Street, 0822 hours
Train 24Z, 0832 hours, Main Street
WB TOFC, Main Street, 0724 hours
2 car/3 diesel CP consist EB, Main Street, 0736 hours
EB doublestack, Main Street, 0748 hours.
EB, Main Street, 1754 hours.
BR&W Connecting Track To Norfolk Southern
Switch To Black River & Western Railroad
To The Left Is The Norfolk Southern Lehigh Line, And To The Left Is The BR&W. Right In The Middle Is The Connecting Track. You Can See The Main Street Crossing Near The Bottom...
Main Street Is In Foreground...
Close up shot of I'm told I12 to avoid the SUV that was in the prevcous picture
NS GP60's and B32's power todays 212 Atlmnta, Georgia to Croxton, NJ
BR&W local does some Saturday freight work xt the NS interchange
Shuffling some covered hoppers around on this rather balsy first day of July
Conrail Blue lead NS traii 18G roaring past me at trackspeed!
NS 214 RUMBLES EAST WITH BNSF PUMPKIN THE LEAD
Working with #4150 at opposite ends of push-pull local.
Working with #5012 at opposite ends of push-pull local.
WB doublestack/intermodal, Main Street, 1803 hours.
Loaded autoracks are passing through Three Bridges Main Street grade crossing at 1:58 on Sunday.
EB, Main Street, 1035 hours, on NS Lehigh Line.
Main Street - Working the Black River & Western/Norfolk Southern interchange.
Page 2 of 25 <-Prev 1 2 3 4 5 6 ... 25 Next->