Craig Hamada photo
Four UP SD40-2s have an empty coal train moving at a good clip up the 2% grade through Gilluly. At Colton, the train will head down the 21 mile Clear Creek branch for loading.
UPRR Dead Line.
UPRR Dead Line.
The engines back up light to their train on the mainline as UP Signal Crews install a new signal cabinet.
Sitting at the north end of the yard were 4 SD40-2's, all UP or ex-UP.
EB mixed freight in the early morning on the Gila Line