BB 16 heads up the passing track  Contributor's Pick!       
2.25.2024 Crozet, VA. Now that BB 16 has been switched to the passing track, it makes its way forward to complete the run-around move at the opposite end of the passing track. There it will be switched to the main, coupled to the waiting dining cars, then proceed back to Staunton. Notice the signal aspect has changed to yellow indicating traffic (the waiting dining cars) occupies the main in this signal block.
Date: 2/25/2024 Location: Crozet, VA   Map Show Crozet on a rail map Views: 14 Collection Of:   Lee Herbert
Locomotives: BB 16(GP38-2)    Author:  Lee Herbert
BB 16 heads up the passing track
Picture Categories: This picture is part of album:  BB
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=6292455