503 - SBB, Switzerland  Contributor's Pick!       
In less than a year, you want be able to see this anymore. In June 2016 first the freight train uses the new basic Gotthard tunnel with a length of 57 km / 35 miles. Later the passenger trains are going to use it too. SBB ordered a second batch of eight ETR 610, Swiss class RABe 503, which are now replacing the ETR 470 on the route to Milan/Italy.
Date: 8/28/2015 Location: Wassen,  CH Country Flag Views: 214 Collection Of:   Peider SwissTrip
Locomotives: SBB 503(UNKNOWN)    Author:  Peider SwissTrip
503 - SBB, Switzerland
Picture Categories: This picture is part of album:  Gotthard Swiss alp transit line, last months without new basic tunnel
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=4300451