UP 5368 Loaded Coal Entering "Big Ten Curve" on the UP Moffat Tunnel Sub  Contributor's Pick!       
After just emerging from Tunnel #1 on the UP Moffat Tunnel Sub, UP 5368 leads a loaded coal train with two leaders, 3 mid-train DPUs (seen here in the background) and a pusher past hot box detector 22.6 and into "Big Ten Curve." Blue Mountain Drive.
Date: 5/17/2015 Location: Rocky, CO   Map Show Rocky on a rail map Views: 346 Collection Of:   Kim Piersol
Locomotives: UP 5368(AC45CCTE) UP 7916(AC45CCTE) UP 8970(SD70AH) UP 7514(AC45CCTE) UP 8141(ES44AC-H)    Author:  Kim Piersol
UP 5368 Loaded Coal Entering "Big Ten Curve" on the UP Moffat Tunnel Sub
Picture Categories: This picture is part of album:  Moffat Tunnel Sub & Joint Line - May 2015
Share
User Comments
Name Type Comments Date
Mike Maskel General GREAT SHOT 5/22/2015 11:10:36 AM
Olaf Junges General Cool shot! 5/23/2015 6:43:38 AM

Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=4192731