| Day 1. Railroad Construction Co.'s crane operator doesn't have much space to work with as he drops new ties along the spur. Canon PowerShot S5 IS:6.0-72.0mm built-in lens @ 30.2mm:f3.5:1/15:AUTO:ISO800. Post processing - cropping, distortion and color correction. |
| Date:
1/19/2015 |
Location:
North Brunswick, NJ |
Views:
157 |
Collection Of:

John Wolan |
|
Author: John Wolan
|
 |
| Picture Categories: Track |
This picture is part of album: Silver Line Tie Replacement and Track Maintenance |