Two or three dips and the tie is firm against the rail. After the entire curve is done a slow order will be placed on this segement of track & after a few trains have passed the track will be checked for level again. Generally with new stone & tamping the track is quite stable and shows very little movement... /DL |
Date:
9/28/2014 |
Location:
Walkersville, MD |
Views:
88 |
Collection Of:
David Larrabee |
|
Author: David Larrabee
|
|
Picture Categories: Track |
This picture is part of album: Curve #10 at MP 7.5 |