BN Train Bridge - reassembly - the swing bridge moves much faster than youd think, swinging out to allow barge traffic up and down the Columbia River, swinging back into place & locking the tracks (youll notice the derail apparatus closed in the final (fourth (4)) image, but open in all the others) in about five minutes from full open to locked closed. And contrary to what youd think, in relative silence. |
Date:
2/19/2014 |
Location:
Vancouver, WA Map |
Views:
164 |
Collection Of:
B Campbell |
|
Author: B Campbell
|
|
Picture Categories: Bridge |
This picture is part of album: Vancouver, WA Station and Assoc Area |