Coming in at the upper left is the new connecting track from the CN mainline and will eventually connect to the EJ&E mainline near the orange concret block in the distance - some 4 months later! |
Date:
6/25/2012 |
Location:
Griffith, IN Map ![Show Griffith on a rail map](/images/map_us.gif) |
Views:
89 |
Collection Of:
![This is one of your favorite contributors](images/star_yellow_small.gif)
Gary Everhart |
|
Author: Gary Everhart
|
![View toward the northeast along the Elgin, Joliet & Eastern Rwy](http://s3.amazonaws.com/rrpa_photos/86881/4dTurnout%20and%20CN_EJE%20diamond%20d%20copy.jpg) |
Picture Categories: Roster,Track,Action |
This picture is part of album: CN to EJE Turnout Construction, Part 2 |