| Looking North on the Ex-NP Casselton-Mayville line. the NP built a line north from Casselton to Mayville in Approx. 1884, the building of the line was a breach of an agreement the NP and GN had so the GN ended up with the NP line heading north out of Casselton. There was never a diamond as the NP Line was built before the Surry Cut-Off was built, which can bee seen at the very bottom of the pic. once the Cut-Off was built the a Wye was installed to the southern line and a switch was installed to the northern line. |