|
| Title: |
Tortoise Slow Motion Switch Machine installation |
| Description: |
Tortoise installation in roadbed with foam board construction. Machines installed from above. Cutout shown |
| Photo Date: |
11/1/2010 Upload Date: 7/15/2012 8:32:31 PM |
| Location: |
Irwin, PA |
| Author: |
James Falcsik |
| Categories: |
Model |
| Locomotives: |
|
| Views: |
267 Comments: 0 |
|
|
|
| Title: |
Tortoise Installation |
| Description: |
Looking down through roadbed at lower deck. Machines and turnouts below. |
| Photo Date: |
11/1/2010 Upload Date: 7/15/2012 8:35:45 PM |
| Location: |
Irwin, PA |
| Author: |
James Falcsik |
| Categories: |
|
| Locomotives: |
|
| Views: |
148 Comments: 0 |
|
|
|
| Title: |
Tortoise with TC3 mounted to it |
| Description: |
Circitron TC3 module for automatic control of the Tortoise using photo eyes. |
| Photo Date: |
11/1/2010 Upload Date: 7/15/2012 8:39:15 PM |
| Location: |
Irwin, PA |
| Author: |
James Falcsik |
| Categories: |
|
| Locomotives: |
|
| Views: |
138 Comments: 0 |
|
|
|
| Title: |
Tortoise Installation |
| Description: |
Machines wired to turnouts and read to be installed in cutout in the background, |
| Photo Date: |
11/1/2010 Upload Date: 7/15/2012 8:39:53 PM |
| Location: |
Irwin, PA |
| Author: |
James Falcsik |
| Categories: |
|
| Locomotives: |
|
| Views: |
137 Comments: 0 |
|
|
|
| Title: |
Tortoise Installation |
| Description: |
Only the wiring is visable after positioning in roadbed on the upper deck. Wire management to follow. |
| Photo Date: |
11/1/2010 Upload Date: 7/15/2012 8:40:34 PM |
| Location: |
Irwin, PA |
| Author: |
James Falcsik |
| Categories: |
|
| Locomotives: |
|
| Views: |
148 Comments: 0 |
|
|
|
| Title: |
Tortoise installation |
| Description: |
Upside down view of machines and supporting plywood roadbed section. |
| Photo Date: |
11/1/2010 Upload Date: 7/15/2012 8:41:15 PM |
| Location: |
Irwin, PA |
| Author: |
James Falcsik |
| Categories: |
|
| Locomotives: |
|
| Views: |
130 Comments: 0 |
|
|
|
| Title: |
Tortoise Installation |
| Description: |
Machines and turnouts in position above cutout. Read to be lowered the last half inch. |
| Photo Date: |
11/1/2010 Upload Date: 7/15/2012 8:43:44 PM |
| Location: |
Irwin, PA |
| Author: |
James Falcsik |
| Categories: |
Model |
| Locomotives: |
|
| Views: |
130 Comments: 0 |
|
|
|
| Title: |
Tortoise installation complete. |
| Description: |
My HO version of the PRR CP Tower with automatic Tortoise switch machines. The roadbed is restored. |
| Photo Date: |
11/1/2010 Upload Date: 7/15/2012 8:44:11 PM |
| Location: |
Irwin, PA |
| Author: |
James Falcsik |
| Categories: |
Model |
| Locomotives: |
|
| Views: |
185 Comments: 1 |
|
|
|
| Title: |
Tortoise Installation |
| Description: |
Tortoise machines and turnouts prepared for the placement in the roadbed. |
| Photo Date: |
11/1/2010 Upload Date: 7/15/2012 8:45:00 PM |
| Location: |
Irwin, PA |
| Author: |
James Falcsik |
| Categories: |
Model |
| Locomotives: |
|
| Views: |
157 Comments: 2 |
|
|
|
| Title: |
Precision Craft Models Split gear problem |
| Description: |
Brand new I1sa model right out of the box had a hitch in the mechanism. Here is the problem. |
| Photo Date: |
7/15/2012 Upload Date: 7/15/2012 8:26:17 PM |
| Location: |
Irwin, PA |
| Author: |
James Falcsik |
| Categories: |
Model |
| Locomotives: |
|
| Views: |
309 Comments: 0 |
|
|
|