Logo
 
 
4/24/2024
 
 
 
 
 
Owner: Swiss Railways
Model:UNKNOWN UNKNOWNBuilt As:Builder Info (Unavailable )
Serial Number:Order No:
Frame Number: Built:
Other locos with this serial:  
  Page Controls   View:  Pics Per Page:
Rollout of Swiss EC250 high speed - low floor train
Title:  Rollout of Swiss EC250 high speed - low floor train
Description:  At the end of October 2014, SBB ordered 29 electric high-speed trains from Stadler to run in the Gotthard Base Tunnel, connecting Basel and Zurich with Milan, starting at the end of 2019. Now in May 2017, 30 month after contract signing, Stadler rolled out the train, which SBB has named “Giruno” Buzzard.
Photo Date:  5/18/2017  Upload Date: 5/19/2017 6:37:15 AM
Location:  Bussnang, CH
Author:  Peider SwissTrip
Categories: 
Locomotives:  SBB 501(UNKNOWN)
Views:  184   Comments: 0


Site Design ©2001-2020 Tim Huemmer
Photos © respective authors
  Contact: info@rrpicturearchives.net